1. Meaning and features

Planning: deciding beforehand what to do, how, when and by whom, so that goals are reached. It is the first function of management; organising, staffing, directing and controlling follow it.

Features

  1. Focuses on objectives — plans are made for goals, never for their own sake.
  2. Primary function — the base for all other functions.
  3. Pervasive — at top, middle and lower levels, in every department.
  4. Continuous — when one plan's period ends, another plan begins.
  5. Futuristic — looks ahead, using forecasts.
  6. Involves decision making — only arises where alternatives exist.
  7. Mental exercise — needs foresight, imagination and judgement.
Table of seven features of planning: focuses on objectives, primary function, pervasive, continuous, futuristic, involves decision making and is a mental exercise, each with a one-line meaning
FeatureIn one line
Focuses on objectivesEvery plan exists to reach a goal
Primary functionComes before the other functions
PervasiveFound at every level and in every department
ContinuousOne plan follows another, period after period
FuturisticLooks ahead and forecasts
Involves decision makingChoosing among alternatives
Mental exerciseNeeds foresight and judgement
Planning is pervasive: scope differs, the activity does not.
Level (imagined cable company)What is plannedTime span
Top: managing directorA new factory in OdishaThree to five years
Middle: production managerMonthly output of each cable typeA month to a year
Lower: shift supervisorWhich worker runs which machine todayA day or a week

Key terms

Planning

Deciding in advance what is to be done, how, when and by whom.

Pervasive

Present at all levels and in all departments of an organisation.

Futuristic

Looking ahead to conditions of a coming period.

2. Importance of planning

  1. Direction: goals stated beforehand tell staff what to aim at.
  2. Reduces risks of uncertainty: forecasting lets managers prepare for change.
  3. Reduces overlapping and wasteful activities: departments act in harmony; duplication is avoided.
  4. Promotes innovative ideas: the hunt for options brings fresh thinking.
  5. Facilitates decision making: goals and forecasts give criteria for choosing.
  6. Establishes standards for controlling: planned targets are the yardsticks for judging results.

Link to controlling: planning sets targets; controlling compares actual results with them. Planning without controlling is pointless; controlling without planning is blind.

Table of six points of importance of planning: provides direction, reduces risks of uncertainty, reduces overlapping and waste, promotes innovative ideas, facilitates decision making, and establishes standards for controlling
ImportanceWhat it does for the firm
Provides directionEveryone knows the goal and their part in it
Reduces risks of uncertaintyPrepares responses before changes arrive
Reduces overlapping and wasteCoordinates departments; no duplicate work
Promotes innovative ideasThe search for options sparks new thinking
Facilitates decision makingGives criteria to judge choices
Establishes standards for controllingTargets become yardsticks for performance
Imagined figures. Planned targets are the standards; the gap is what controlling acts on.

Key terms

Standard

A planned target against which actual performance is compared.

Uncertainty

Not knowing what will happen in the future, which planning prepares for.

3. Limitations of planning

  1. Rigidity: managers feel bound to a fixed plan and cannot seize new chances.
  2. May not work in a dynamic environment: policy, technology, competition or demand may change after the plan is made.
  3. Reduces creativity: plans come from the top; lower levels mostly carry them out.
  4. Huge costs: information, experts and forecasts cost money.
  5. Time-consuming: long preparation may leave no time for action.
  6. Does not guarantee success: past success can breed false confidence.

Reducing them: flexible plans, review points, participation of staff, follow-up.

Table of six limitations of planning: rigidity, may not work in a dynamic environment, reduces creativity, involves huge costs, time-consuming, and does not guarantee success, each with the reason it arises
LimitationWhy it happens
Leads to rigidityManagers feel bound to the fixed plan
May not work in a dynamic environmentPolicy, technology or demand changes unexpectedly
Reduces creativityLower levels mainly carry out plans made at the top
Involves huge costsSurveys, experts and forecasts are expensive
Time-consumingLong preparation can delay action
Does not guarantee successA plan helps only if it fits conditions and is carried out
A change in the environment can overtake a plan
Living with the limitations

Key terms

Rigidity

Inability to change a plan once it has been fixed, even when change is needed.

Dynamic environment

A business environment that keeps changing in ways a plan may not foresee.

4. The planning process

  1. Setting objectives for the firm and each department.
  2. Developing premises: forecasts and assumptions; every planner should use the same ones.
  3. Identifying alternative courses of action.
  4. Evaluating alternative courses: positives, negatives, cost, risk, returns.
  5. Selecting an alternative (or a combination).
  6. Implementing the plan: resources, people and deadlines assigned; action begins.
  7. Follow-up action: monitoring and correcting.

Tip: steps 3, 4 and 5 are list, weigh, choose.

The planning process
Premises are forecasts; all planners should work from the same ones.
Premise (assumption about the future)Plan it affects
Demand for school shoes will rise before JuneProduction plan
Leather prices will stay steadyPurchase budget
A new GST return rule will start next yearAccounts staffing
Steps 3 to 5: list, weigh, choose.
Alternative (imagined sweet shop)CostRiskLikely gain
Open a second outletHighMediumHigh
Start home deliveryLowLowMedium
Supply hotelsMediumHighMedium

Key terms

Premises

Assumptions about future conditions on which plans are based.

Follow-up action

Monitoring a plan after implementation and correcting it where needed.

5. Single-use and standing plans; objectives and strategy

Single-use plans serve one non-recurring event or project: programmes, budgets for one occasion. They lapse when the event is over.

Standing plans guide recurring situations again and again: policies, procedures, methods, rules.

Objectives: end results the organisation seeks; best when measurable and time-bound. All other plans serve them.

Strategy: a comprehensive plan that fixes long-term direction, the course of action and the allocation of resources, with the business environment in view.

Two families of plans
Table comparing objectives and strategy: an objective is the end result wanted, such as thirty outlets in five years; a strategy is the comprehensive plan covering direction, action and resources, such as franchise outlets with local flavours
ObjectiveStrategy
What it isThe end result wantedThe comprehensive plan to reach long-term goals
Imagined exampleThirty outlets in Telangana in five yearsFranchise outlets, local flavours, most funds to the first ten
Looks atWhere the firm wants to beDirection, action and resources, given the environment

Key terms

Single-use plan

A plan for a one-time event or project, not used again.

Standing plan

A plan used repeatedly for situations that recur.

Strategy

A comprehensive plan covering direction, course of action and allocation of resources.

6. Policy, procedure, method, rule, programme, budget

  • Policy: a general guide to thinking and decisions; leaves room for judgement (e.g. "promote from within where suitable").
  • Procedure: a fixed order of steps for a routine activity.
  • Method: the prescribed way of doing one task or step; the best method saves time and effort.
  • Rule: a specific do or do not; no discretion; a penalty usually follows a breach.
  • Programme: a detailed plan of a project: tasks, people, resources and timing.
  • Budget: expected results in numbers for a future period; also a control device.
Table distinguishing policy and rule: a policy is a general guide that allows discretion and has no penalty; a rule is specific, allows no discretion and usually carries a penalty
BasisPolicyRule
NatureGeneral guide to decisionsSpecific statement of what to do or not do
DiscretionAllowedNone
PenaltyUsually noneUsually attached
Imagined example"We prefer local suppliers where possible""No phones on the packing line"
A procedure: steps in order. A method: how one step is done (for example, scanning bills instead of photocopying)
Imagined figures. A budget is a plan in numbers and later a control device.

Key terms

Policy

A general guide to decision making that allows discretion.

Procedure

The chronological sequence of steps for a routine activity.

Method

The prescribed way in which one task is performed.

Rule

A specific statement of what must or must not be done, with no discretion.

Budget

A plan stating expected results in numerical terms.

Exam tips

Common mistakes

  • Writing "pervasive means very important": it means present at all levels.
  • Mixing up rigidity (the firm will not change its plan) and dynamic environment (the outside world changes).
  • Treating identifying alternatives and evaluating them as one step.
  • Calling a guide with "where possible" a rule (it is a policy), or a list of steps a method (it is a procedure).
  • Calling a one-time budget a standing plan.

How marks are usually awarded

  • 1 mark: the correct option, or the name of the concept.
  • Case parts: 1 mark for naming the feature, step or plan, 1 for the quoted line or reason.
  • 3 marks: three points, each explained.
  • 5 marks: five named points, each explained in a sentence (about 120 words).