Skip to content
Skip to page content
soylai.com

Controlling — Notes

6 sections 5 min readBeta

1. Meaning and features

Controlling is the management function of seeing that actual work conforms to plans, and of correcting deviations when it does not. Every manager, at every level, controls the work under them.

Features

  1. Goal-oriented — it keeps the organisation on course to its goals.
  2. Pervasive — at all levels, in business and non-business organisations alike.
  3. Continuous — the cycle of checking never stops.
  4. A primary function of every manager.
  5. Backward- and forward-looking — it reviews work done, and its findings improve future work.
Table of five features of controlling: goal-oriented, pervasive, continuous, a primary function of every manager, and both backward- and forward-looking
FeatureIn one line
Goal-orientedKeeps the organisation moving towards its planned goals
PervasiveDone at every level and in every kind of organisation
ContinuousGoes on all the time, not only at the year end
Primary functionEvery manager must control the work under them
Backward- and forward-lookingChecks past work and improves future work
Controlling compares what happened with what was planned, then acts.
QuestionAt an imagined school canteen in Bhopal
What did we plan?Serve 400 lunches by 1:15 p.m.
What actually happened?360 lunches served by 1:15 p.m.
What is the gap?40 lunches late
What will we do?Start cooking rice 20 minutes earlier

Key terms

Controlling

Ensuring that activities take place as planned and correcting them where they do not.

Deviation

The difference between actual performance and the standard.

2. Importance of controlling

  1. Accomplishing organisational goals — gaps are found early and closed.
  2. Judging accuracy of standards — repeated large gaps (above or below) show that a standard needs revision.
  3. Making efficient use of resources — working to standards reduces waste and spoilage.
  4. Improving employee motivation — employees know beforehand what is expected and the basis of appraisal.
  5. Ensuring order and discipline — close checks reduce dishonest behaviour.
  6. Facilitating coordination in action — each department works to standards that fit with the others.
Table of six points of importance of controlling: accomplishing goals, judging accuracy of standards, efficient use of resources, improving motivation, order and discipline, and facilitating coordination
ImportanceWhat it means
Accomplishing goalsGaps are spotted and closed in time
Judging accuracy of standardsShows when a target is too high or too low
Efficient use of resourcesWork to standards cuts waste
Improving motivationPeople know what is expected and how they will be judged
Order and disciplineChecks discourage dishonest behaviour
Facilitating coordinationDepartments work to standards that fit together
Table linking lines from an imagined bus depot in Mysuru to the importance of controlling: weekly tyre checks show efficient use of resources, twice-daily cash counts show order and discipline, an award for on-time trips shows motivation, and reviewing an unmet target shows judging accuracy of standards
Line in a case (imagined bus depot, Mysuru)Importance
"Tyre wear is now checked weekly, and fewer tyres are scrapped early"Efficient use of resources
"Ticket cash is counted twice a day, and shortages have stopped"Order and discipline
"Drivers know that on-time trips decide their award"Improving motivation
"No route ever met the 98% on-time target, so it was reviewed"Judging accuracy of standards

Key terms

Standard

A predetermined criterion (target) against which performance is judged.

3. Limitations of controlling

  1. Difficulty in setting quantitative standards — morale, courtesy and job satisfaction cannot easily be counted, so control over them is less effective.
  2. Little control on external factors — government policy, technology, competition and natural events lie outside the firm.
  3. Resistance from employees — strict checks (cameras, tracking) may be seen as a curb on freedom.
  4. Costly affair — control systems take money, time and effort; the benefit should exceed the cost, which can be hard for small firms.
Table of four limitations of controlling: hard to set quantitative standards, little control on external factors, resistance from employees, and high cost
LimitationWhy control cannot be perfect
Hard to set quantitative standardsMorale, courtesy and satisfaction resist numbers
Little control on external factorsPolicy, technology and rivals lie outside the firm
Resistance from employeesClose checks can feel like distrust
Costly affairSystems need money, time and effort
Table of four questions to identify a limitation: whether it can be put into numbers, whether it started outside the firm, whether people object to checks, and whether the system costs more than it saves
Ask about the problem…If yes, the limitation is…
Can it be put into numbers?If not: difficulty in setting quantitative standards
Did it start outside the firm?If so: little control on external factors
Are people objecting to the checks?Resistance from employees
Is the system worth more than it saves?If not: costly affair

4. Planning and controlling

Planning and controlling are inseparable twins. Planning sets goals and standards; controlling checks whether they are being achieved.

  • Planning without controlling is meaningless: no one knows whether the plan works.
  • Controlling without planning is blind: there is nothing to measure against.

Both look back and forward. Planning draws on past results and control reports to set future goals; controlling reviews completed work, but corrective action and revised standards improve the future.

Planning gives the standards; controlling feeds back into the next plan.
Table showing that planning looks back by using past results and looks forward by setting goals, and that controlling looks back by measuring work done and forward by correcting causes and revising standards
FunctionLooks back by…Looks forward by…
PlanningUsing past results and control reportsSetting goals for the coming period
ControllingMeasuring work already doneCorrecting causes and revising standards

5. The controlling process: steps 1 to 3

1. Setting performance standards — quantitative (units, cost, time, defects) or qualitative (goodwill, morale). Standards should be precise and flexible.

2. Measurement of actual performance — objective and reliable, in the same units as the standard; by personal observation, sample checking or performance reports.

3. Comparing actual performance with standards — reveals whether there is a deviation and how large it is.

Percentage deviation = (actual − standard) ÷ standard × 100, stated as a shortfall or an excess.

The controlling process
Standards should be precise and also flexible enough to revise.
Quantitative standards (numbers)Qualitative standards (no simple number)
Produce 300 bicycles a dayImprove the goodwill of the brand
Cost of ₹200 per jarKeep workers' morale high
Deliver 98 in 100 parcels within 48 hoursMake guests feel welcome
Table of three measurement techniques: personal observation, sample checking and performance reports, each with an imagined example
TechniqueExample (imagined firms)
Personal observationA floor manager watches the packing line
Sample checkingWeighing 50 soap cakes from each batch
Performance reportsWeekly sales report from each branch
Imagined figures. Comparing each bar with the dashed standard line is step 3.
Percentage deviation = deviation ÷ standard × 100.
Item (imagined dairy, Karnal)StandardActualDeviationAs % of standard
Milk collected (litres a day)10,0009,4006006%
Packets torn in packing (a day)2002606030%
Vans leaving on time (out of 50)504824%

Key terms

Sample checking

Testing a few items to judge a whole batch.

Percentage deviation

The gap between actual and standard, divided by the standard and multiplied by 100.

6. Steps 4 and 5: analysing deviations and corrective action

4. Analysing deviations

  • Critical point control: focus on key result areas (KRAs) that affect the entire organisation, e.g. raw-material cost or safety, rather than on everything equally.
  • Management by exception: only significant deviations beyond a permissible limit are brought to senior managers; minor ones are handled lower down. If managers try to control everything, they may end up controlling nothing.
  • Then find the cause: machines, people, materials, unrealistic standards or outside factors.

5. Taking corrective action — remove the cause (repair, train, reorder, motivate), or revise the standard if it was unrealistic. No action is needed when the deviation is within the limit.

Three questions before acting
A small slip in a key result area hurts the whole firm.
Key result area (watch closely)Minor area (leave to juniors)
Cost of steel in a car-parts firmOffice tea and snacks
Safety readings in a chemical plantGarden upkeep
Cash collection in a supermarketPrinting of notice boards
Points inside the shaded band are handled by supervisors; only the point above the line is reported.
Table of the imagined bicycle factory's daily output, deviation and percentage deviation from 300, showing that only Thu is beyond the 5 per cent limit and is reported
DayActualDeviation% of 300Beyond 5%?
Mon30000%No
Tue288124%No
Wed30662%No
Thu2703010%Yes: report
Fri29731%No
Table pairing causes of deviation with corrective actions: faulty machines with repair or replacement, untrained workers with training, late material with earlier orders, low morale with incentives, and unrealistic standards with revision
Cause of deviationCorrective action
Old or faulty machinesRepair, replace, preventive maintenance
Untrained workersTraining, closer supervision
Late raw materialOrder earlier, buffer stock, second supplier
Low moraleIncentives, recognition, listening to grievances
Unrealistic standardRevise the standard

Key terms

Key result area

An area of work whose results affect the whole organisation.

Critical point control

Concentrating control on key result areas.

Management by exception

Reporting only significant deviations, beyond a set limit, to higher management.

Exam tips

Common mistakes

  • Writing "comparison" when the line describes measurement (counting, weighing, collecting reports).
  • Dividing the deviation by the actual figure instead of the standard.
  • Mixing up critical point control (which areas) and management by exception (which deviations).
  • Suggesting a corrective action that does not match the cause in the case.
  • Calling controlling only backward-looking.

How marks are usually awarded

  • 1 mark: the correct option, or the name of a step, feature, importance or limitation.
  • 3–4 mark cases: name + quoted line for each part.
  • 5 marks: five headed points; for the process, all five steps in order.

All firms and figures in SOYL practice are imagined; the board paper gives its own case.