1. Kinds of cost
- Explicit cost: payment to outsiders (wages, materials, rent paid).
- Implicit cost: imputed value of the owner's own factors (own shop, savings, time); not in the books.
- Economic cost = explicit + implicit.
- Money cost: rupee spending. Real cost: toil, risk and sacrifice of factor owners.
- Private cost: cost borne by the firm. Social cost = private cost + external cost imposed on others.
| Explicit cost | Implicit cost | |
|---|---|---|
| Meaning | Actual payment to outsiders | Imputed value of the owner's own factors |
| Imagined Bhopal tailor | Cloth, thread, assistant's wage | Rent of her own shop, her forgone salary |
| In the account books? | Yes | No |
| Counted by economists? | Yes | Yes |
| Concept | What it measures | Imagined Kolhapur jaggery unit |
|---|---|---|
| Money cost | Rupee spending on inputs and hired factors | Cane, fuel, helpers' wages |
| Real cost | Toil, risk and sacrifice of factor owners | The family's nights at the boiling pans |
| Economic cost | Explicit plus implicit costs | Payments plus the family's forgone income |
Key terms
- Implicit cost
The imputed value of factors owned and supplied by the firm's owner, for which no payment is made.
- Social cost
The total cost to society of producing a good: private cost plus external cost.
2. Opportunity cost; accounting and economic profit
Opportunity cost = value of the next best alternative forgone. A resource with no alternative use has zero opportunity cost.
Accounting profit = revenue − explicit costs. Economic profit = accounting profit − implicit costs. A firm can show an accounting profit yet make an economic loss.
| Use of the land for one season | Income (₹) | Rank |
|---|---|---|
| Cotton | 80,000 | Chosen |
| Soybean | 65,000 | Next best |
| Lease to a neighbour | 50,000 | Third |
| Step | Working (₹ a month) | Result |
|---|---|---|
| Accounting profit | 2,40,000 − 1,85,000 | 55,000 |
| Implicit costs | 40,000 salary + 10,000 rent | 50,000 |
| Economic profit | 55,000 − 50,000 | 5,000 |
Key terms
- Opportunity cost
The value of the next best alternative given up when a resource is used in a particular way.
- Economic profit
Revenue minus explicit and implicit costs.
3. Short-run total costs
TFC: does not change with output; horizontal line; paid even at zero output.
TVC: zero at zero output; rises first at a decreasing rate, then at an increasing rate.
TC = TFC + TVC: same shape as TVC, starting at the TFC level; the vertical gap TC − TVC = TFC is constant.
| Fixed cost | Variable cost | |
|---|---|---|
| Changes with output? | No | Yes |
| At zero output | Still paid | Zero |
| Imagined Haldwani juice plant | Shed rent, loan interest, manager's salary | Fruit, bottles, power, daily wages |
| Exists in the long run? | No | Yes (all costs) |
Key terms
- Fixed cost
Cost that does not vary with output in the short run.
- Variable cost
Cost that varies directly with output and is zero at zero output.
4. Average and marginal costs
AFC = TFC ÷ Q (rectangular hyperbola). AVC = TVC ÷ Q. AC = TC ÷ Q = AFC + AVC. MC = TCn − TCn−1 = TVCn − TVCn−1; fixed cost does not affect MC.
To complete a schedule: from TC subtract TFC; from AVC multiply by Q; from MC add up successive values.
| Cost | Formula | Shape |
|---|---|---|
| TC | TFC + TVC | Starts at TFC; parallel to TVC |
| AFC | TFC ÷ Q | Rectangular hyperbola |
| AVC | TVC ÷ Q | U-shaped |
| AC | TC ÷ Q = AFC + AVC | U-shaped, minimum to the right of AVC |
| MC | TCn − TCn−1 = TVCn − TVCn−1 | U-shaped, turns up first |
| Jars | TC | TVC | AFC | AVC | AC | MC |
|---|---|---|---|---|---|---|
| 0 | 60 | 0 | — | — | — | — |
| 1 | 100 | 40 | 60 | 40 | 100 | 40 |
| 2 | 130 | 70 | 30 | 35 | 65 | 30 |
| 3 | 150 | 90 | 20 | 30 | 50 | 20 |
| 4 | 180 | 120 | 15 | 30 | 45 | 30 |
| 5 | 230 | 170 | 12 | 34 | 46 | 50 |
| Bells | AVC | TVC = AVC × Q | TC | MC |
|---|---|---|---|---|
| 1 | 30 | 30 | 120 | 30 |
| 2 | 25 | 50 | 140 | 20 |
| 3 | 22 | 66 | 156 | 16 |
| 4 | 24 | 96 | 186 | 30 |
Key terms
- Marginal cost
The addition to total cost from producing one more unit of output.
- Average cost
Total cost per unit of output; also called average total cost.
5. Relationships among MC, AVC and AC
- MC below an average → the average falls; MC equal → average at its minimum; MC above → average rises.
- MC therefore cuts AVC and AC at their lowest points; MC reaches its own minimum first, then AVC, then AC.
- AC − AVC = AFC, so the curves approach each other but never meet.
- U-shapes in the short run come from the law of variable proportions.
| When… | Then the average… |
|---|---|
| MC is below it | falls |
| MC equals it | is at its minimum |
| MC is above it | rises |
| Output | TVC | AVC | MC |
|---|---|---|---|
| 3 | 99 | 33 | 19 |
| 4 | 112 | 28 | 13 |
| 5 | 125 | 25 | 13 |
| 6 | 144 | 24 | 19 |
| 7 | 175 | 25 | 31 |
| 8 | 224 | 28 | 49 |
Key terms
- Law of variable proportions
With some factors fixed, adding a variable factor first raises and later lowers its marginal product, so costs first fall and then rise.
6. Short-run and long-run cost curves (concepts only)
In the long run all factors are variable, so all costs are variable and there is no AFC.
Each plant size has its own SAC. The LAC shows the lowest average cost of each output when the best plant is chosen; it touches every SAC from below and is called the envelope or planning curve. It is flatter than any SAC and U-shaped because of economies and then diseconomies of scale. (Derivation of the curves is not required.)
| Short run | Long run | |
|---|---|---|
| Factors | At least one fixed (plant) | All variable |
| Costs | Fixed and variable | All variable |
| AC curve | SAC: steeper U | LAC: flatter U, envelope of SACs |
| Reason for U-shape | Law of variable proportions | Economies, then diseconomies of scale |
Key terms
- Envelope curve
The long-run average cost curve, which touches each short-run average cost curve from below.
- Economies of scale
Savings in average cost from a larger scale of production.
Exam tips
Common mistakes
- Adding all alternatives to find opportunity cost instead of taking the next best.
- Leaving implicit costs out when asked for economic profit.
- Starting the TC curve at the origin, or drawing TFC as rising.
- Computing MC as TC ÷ Q, or subtracting the next total cost instead of the previous one.
- Saying AFC becomes zero, or that AC and AVC meet.
- Explaining the U-shape of the long-run AC by fixed costs.
How marks are usually awarded
- 1 mark: one correct option, value or term.
- 2 marks: definition with an example, or formula and answer.
- 3 marks: working for several values, or three explained points.
- 5 marks: parts answered in order, with completed schedules or described diagrams and reasons.